Group Ride South To Gilroy

This week my group rode up into the hills southeast of towards . We took the beautiful Burchell Road to its end at . After crossing the highway (carefully due to potential for fast traffic) we picked up the bike path that leads to the , passing the Uvas Creek Preserve on the way. We took a side trip through Christmas Hill Park, which I had not been to in years. I’d forgotten how nice it was. After reaching the sports complex we took Santa Teresa Boulevard back to and lunch, for a bit over 30 miles riding.

The next day I had an errand down in Gilroy so I took my e-bike on a more direct route down Monterey highway. Although this can be busy it is still safe due to a wide shoulder and bike lane. It was pretty quiet and pleasant at the time I went. My e-bike has 3 levels of assist. I had it in 2 on the way down and got to my errand in 47 minutes. I discovered another bike path I was unaware of for about 1.5 miles along a canal. On the way back I had plenty of battery left so tried 3 (also called “turbo”), and made it in a fast and fun 37 minutes. This would have taken around 40 minutes by car but I wouldn’t have gotten a workout or enjoyed it as much.

Fitness and Exercise
Some of the Many Giant Redwoods Thriving in Christmas Hill Park

Original source: https://bionicoldguy.home.blog/2023/12/02/group-ride-south-to-gilroy/

You May Also Like